Concrete Slab Calculator for Austin TX

This concrete slab calculator for Austin, TX turns a slab's length, width and thickness into cubic yards of concrete and an installed price range from two dated Austin sources. Use it to check a quote or plan a budget, then send the numbers for a free quote.

  • Cubic yards with waste
  • Two Austin price sources
  • Ready-mix cost
  • Works for footings
Get a Free Quote

Concrete slab calculator

Concrete slab estimator

Enter the slab size. Results update as you type.

Slab area
400 sq ft
Concrete to order
5.43 cu yd
4.94 cu yd net, plus 10%
Installed, HomeBlue Austin rate
$2,400 to $4,000
Installed, projectcosted Austin rate
$2,252 to $4,504
Ready-mix only (no labor, base, steel or delivery)
$619 to $733

Installed ranges multiply the area by HomeBlue's Austin reinforced-slab rate ($6 to $10 per sq ft, September 2024) and projectcosted's Austin rate ($5.63 to $11.26 per sq ft, August 2026). Ready-mix uses HomeBlue's Austin $114 to $135 per cubic yard. A planning range, not a quote.

The calculator runs in your browser and saves nothing. For an L-shaped or odd slab, split it into rectangles, run each one and add them up.

How the concrete slab calculator works

Volume first, then price. Concrete is sold by the cubic yard, which is 27 cubic feet, so the math is:

Installed price

The installed ranges multiply the slab area by each Austin source's per-square-foot rate. They include labor, forming, base and steel as those sources define them. projectcosted's Austin breakdown puts labor at about half of a typical job and materials at about a third.

Concrete needed for common slab sizes

Here are the sizes people ask about most, worked out at 4 and 6 inches. These are net volumes; add your waste allowance on top.

Cubic yards of concrete by slab size (net, before waste)
Slab sizeArea4 in thick6 in thick
10x10100 sq ft1.23 cu yd1.85 cu yd
12x12144 sq ft1.78 cu yd2.67 cu yd
12x20240 sq ft2.96 cu yd4.44 cu yd
20x20400 sq ft4.94 cu yd7.41 cu yd
24x24576 sq ft7.11 cu yd10.67 cu yd
30x401,200 sq ft14.81 cu yd22.22 cu yd
40x602,400 sq ft29.63 cu yd44.44 cu yd

Swipe the table sideways to see every column →

Computed: area x thickness / 12 / 27. Thickened edges, beams and footings add volume a flat-slab formula doesn't count.

Worker leveling wet concrete between wood forms with a screed board
Wood forms set the height; a straight board drags the excess off the top. Stock photo, not a job by this site.

Picking the thickness to enter

Thickness changes both yards and cost. The residential code's floor-slab minimum is 3.5 inches; HomeBlue's Austin guide puts residential slabs at 4 to 6 inches; Bullfrog Spas asks for at least 4 inches under a hot tub and 6 or more under a swim spa; steel building supplier MBMI gives 4 to 6 inches for most shop slabs and 6 to 8 with heavy equipment. The slab thickness and rebar guide goes use by use.

Concrete slab thickness chart for the Austin TX slab calculator: 4 inch patios and pads, 6 inch swim spa pads, 4 to 6 inch shop slabs
Our own diagram, from the sources cited on this page. Not to scale.

What a calculator can't tell you

A flat-slab calculator misses the parts of an Austin job that cost the most to get wrong: thickened edges and beams on clay, rock that has to be broken on the west side, removal of an old slab ($1.10 to $1.70 per square foot on HomeBlue's Austin page), and the pump or extra labor when a truck can't reach the spot. Use the result as a budget check, then compare it with a written quote. The cost to pour a concrete slab in Austin page lists those line items.

Request a Free Quote

Four fields. Free, and nothing is committed.

Concrete Slab Calculator for Austin TX: Frequently Asked Questions

How do you calculate concrete for a slab?

Multiply length by width in feet, multiply by the thickness in feet (inches divided by 12), and divide by 27 to get cubic yards. A 20x20 slab 4 inches thick is 20 x 20 x 0.333 / 27 = 4.94 cubic yards, before waste.

How many yards of concrete for a 20x20 slab?

About 4.94 cubic yards at 4 inches thick and 7.41 at 6 inches, before waste. With 10 percent extra, order about 5.4 or 8.1 yards.

How many yards of concrete for a 30x40 slab 4 inches thick?

1,200 square feet at 4 inches is 14.8 cubic yards, or about 16.3 with 10 percent extra. At 6 inches it is 22.2 yards, about 24.4 with extra.

How much extra concrete should I order?

Order a margin over the net volume for spillage, forms that bow and a base that isn't perfectly flat. This calculator defaults to 10 percent and offers 15 for rough or hand-dug clay subgrade. Running short mid-pour means a second truck and a seam in the slab, which costs more than a little leftover concrete.

How do I estimate concrete slab cost in Austin?

Multiply the area by an Austin installed rate: $5.63 to $11.26 per sq ft (projectcosted, August 2026) or $6 to $10 for a reinforced slab (HomeBlue, September 2024). The calculator above does both. Concrete alone is $114 to $135 per cubic yard in Austin per HomeBlue.

Can I use this calculator for footings?

Yes. Enter the footing's total length, its width in feet as the second number, and pick the thickness closest to its depth, or work it by hand: a 12 inch wide, 12 inch deep footing holds 1 cubic foot per foot of length, so 27 feet of it is one cubic yard.